2012年3月10日土曜日

D-Day today

This piece of wooden part for entrance cost about 60,000 yen being set on the floor in new laboratory.

Today, residual wall paper and flooring procedure were performed in the rain fall climate condition, as for me, carrying 3 book stands from my villa to new place in B-Vectra's cargo room, resulting my exhaustion in the evening.
The wagon shape automobile is much useful than sedan one if the purpose is a district for carrying luggage.

Because wall paper finishing had not be done when NTT light transmitting-receiving cable engineer came the day before yesterday, they went home without business work resulting postponing till 15th this month!
It was very inconvenient for us opening on 14th Wednesday this month, how come?
My desperate efforts to ask them to do that before 14th with begging by bending 7 joints into 8 pieces, our wish was heard by them, nothing is more lucky than this, because the scenery that our new opening of new laboratory but without a telephone line would not be acceptable for us?

All of the official documents have submitted safely this afternoon according to the fixed regulation.
99% of preparation for moving machinery has covered by myself and residual 1% of work would be done by a professional from the factory, he is one of my relative. Especially the reassembling of the X-Ray head of Tomography apparatus would be performed  by the professional, I never.
With all the complicated schedule of our new building of laboratory, we'll be able to open on the decided date!