2012年3月31日土曜日

Post-processing

Letter pack 500 from Payment Fund arrived this noon in time for the limited time, involving the new special code stump inside. The promise was kept safe. Thanks to the consideration by the Authorities, we can continue our business without any delay from now.

The vacuum system is going to set on another place not to propagate our irritating and polluting noise and vibration into the neighbor. After the negotiation with our builder, further repairing would be done on coming Thursday. The supporting construction would be formed on the base hard ground surface independently with covering solid wooden box lining with rubber sheets inside.
Hi-power and noise making vacuum system requires special professional work to overcome problems.

Emigration of our laboratory to another place needs energy and stamina to be settled in peace.

0 件のコメント:

コメントを投稿